We had just unloaded the truck. I had picked up Darío and Sr. Espinosa (in the picture) along with the 20 ft length of tubo in the picture and Sr. Espinosa’s tools. The entire area was a swamp.
The road is the carretera principal, that runs from David to Potrerillos Arriba. The site is a mile, [...]
Filed under: Chiriquí, construction, utilities, water | Leave a Comment »